Dreamflower Leyenda is the 68th project of Dreamflower Housing Projects Pvt. Ltd. It is located at Valloor Road just 300 m from Petta Metro Station. There will be 27 premium flats (8 units of 3BHK and 19 units of 2 BHK) in 25.47 cents of land. The structure is Ground plus four floors with ample car parking space in the Ground floor with stilt parking.
Type | Area | Price | Model | Available Floor |
---|---|---|---|---|
A 401 | 1220 Sqft | 7800000 | 3 BHK | 4th Floor |
B 102 | 925 Sqft | 5800000 | 2 BHK | 1st Floor |
B 202 | 925 Sqft | 5800000 | 2 BHK | 2nd Floor |
B 302 | 925 Sqft | 6000000 | 2 BHK | 3rd Floor |
B 402 | 925 Sqft | 6000000 | 2 BHK | 4th Floor |
C 203 | 990 Sqft | 6200000 | 2 BHK | 2nd Floor |
C 303 | 990 Sqft | 6400000 | 2 BHK | 3rd Floor |
C 403 | 990 Sqft | 6400000 | 2 BHK | 4th Floor |
D 104 | 1020 Sqft | 6400000 | 2 BHK | 1st Floor |
D 204 | 1020 Sqft | 6400000 | 2 BHK | 2nd Floor |
E 105 | 860 Sqft | 5400000 | 2 BHK | 1st Floor |
E 405 | 860 Sqft | 5600000 | 2 BHK | 4th Floor |
F 106 | 995 Sqft | 6300000 | 2 BHK | 1st Floor |
F 206 | 995 Sqft | 6300000 | 2 BHK | 2nd Floor |
F 306 | 995 Sqft | 6500000 | 2 BHK | 3rd Floor |
F 406 | 995 Sqft | 6500000 | 2 BHK | 4th Floor |
G 407 | 1330 Sqft | 8850000 | 3 BHK | 4th Floor |
RCC framed earthquake resistant structure. Foundation as per structural Requirement. Walls with solid blocks.
Passenger cum bed lift stopping on all floors.
Firefighting arrangements as per Kerala Building Rules and Fire Force requirement. Every floor provided with hose reel box and hose.
Water Supply Filtered water from open/bore well through sump and overhead tank. Common plumbing line for each flat with separate control valves.
Three phase power supply with concealed conduit wiring with copper conductor, adequate light and fan points, 6/16A plug points etc. controlled by ELCB and MCB's with independent energy meter. Elegant switches and quality Electrical wires. Tubes & fans in all bedrooms, Hall & Living Room.
Centralized gas with separate meter for each apartment.
ISI brand pipes, EWC washbasin, Taps for bathroom.
For lifts, common lights, water pumps etc. Automatic generator changes over cum load limiter with a power allocation of 500W for 2BHK and 750W for 3BHK. Power Plugs not connected during generator supply mode.
Concealed cable TV point in living room.
Provision for AC in Master Bedroom.
2*2 Vitrified tiles for the entire apartment, Vitrified tiles for lobby and common area.
Ceramic tiles for floors and glazed tiles for walls up to 6ft height. Concealed pipes and CP fittings. Hot and cold water taps with overhead shower and provision for geyser. Wash basin in bathrooms and dining space. Cera/Parryware Wall Mount EWC.
Putty finished walls with Emulsion finish for all rooms. Asian paints/ Equivalent Emulsion for all walls. Enamel finish for Inside doors and windows. Front door with Melamine Finish. Exterior painting with Asian Paints Apex.
Front Door Veneered Pre-hung Flush Door. Masonite USA Skin doors for inside doors. Windows using Powder coated Aluminum clear glass.
Dorset lock/ Equivalent set lock for front Door, Stainless steel hinges. Branded brass fittings and mortise lock for inside doors.